Your trusted, independent inspection partner
The defects you discover later.
We uncover before handover.
Singapore defect inspections, engineering-led — for new BTOs, condos, landed homes, post-renovation and tenancy handovers.
Our free app walks you through the visual checks, room by room — the defects you can spot yourself. Sign up to save your list. For the ones that need calibrated tools and an independent report, see pricing ↓.
Inspection
checklist.
- Hollow tiles: tapped floor by floor
- Water leaks: wet areas flood-tested
- Electrical: socket polarity + RCD
- Window & door seals: weathertight
- Household shelter: SCDF seal
- Walls & ceiling: cracks, paint, finishes
- Plumbing: taps, drainage & pressure
- Carpentry: doors, cabinets & skirting
THE METHOD
Engineering-led. Sharper tools.
A condensed tour of one inspection, from arrival to filed report: 3D walkthrough capture, automated defect tagging, and the PDF that lands with your developer. Video coming soon.
Inspector-led, evidence-first
Our senior inspector walks the unit room by room. Every defect is photographed and severity-tagged on the spot, building the defect list that lands with your developer within 24 hours.
Submission-ready in 24 hours
Report prepared in your developer's required format and ready to submit within 24 hours of inspection.
With you through the warranty
We stay on WhatsApp through your full DLP — advising on developer replies and helping you re-flag anything brushed aside.
Scan a defect. Our AI classifies it.
Coming soon. Point your phone at a wall, tile, or fitting and the detector names what it finds: hairline cracks, hollow tiles, drainage faults, uneven finishes. A tool for buyers who want to check the home themselves, or a second pair of eyes alongside your inspection. Early access opens at launch.
WHY NOW
Most expensive defects
surface after the warranty expires.
Your developer's defect liability period is twelve months. After it closes, every issue becomes yours to fix, at full cost. We find what others miss while the developer is still the one who has to fix it, free.
Hidden defects surface 12–24 months in. Past your developer's window.
Without an independent record at handover, your complaint is your word alone.
Once renovation begins, developers commonly blame pre-existing defects on your contractor and refuse rectification. Inspect before any work starts.
Cheap to rectify during DLP. Usually harder and more expensive once that window closes.
WHY PROPDEFECT
Independent. Methodical. Built for Singapore.
Led by (Elected) Senior Members of the Institution of Engineers Singapore · accredited Expert Witnesses · Certified Project Managers · a former BCA professional · 25+ years across S$2B+ of Singapore construction. About us →
FOUR-STEP PROCESS
From booking to peace of mind.
WhatsApp Brief
Drop us your unit details. We confirm a slot within minutes, no forms, no callbacks.
Onsite Scan
One senior inspector on-site. Every finding is reviewed by a supervisor before the report is filed. Coverage: plumbing, electrical, structural, finishing, moisture and tiling.
Filed Report
Photo-evidenced report, prepared in your developer's preferred format, ready for you to file. Copy archived for your records.
Ongoing consultation
WhatsApp follow-up throughout your Defect Liability Period (DLP). We help interpret rectification correspondence, escalate where needed, and stay reachable through the warranty window.
See the full inspection checklist: every system, every checkpoint
PRICING · FIXED PACKAGES
Fixed prices, by home size.
Questions about timelines, reports, or rectification support? See our FAQ
Twelve months.
Every defect the developer must fix, free.
Book now — the developer is still obligated to fix every defect, free.